{"schema":"https://ver.cy/schemas/card/1.0.0","id":"vr.tr.cost-overrun","code":"thing-cost-overrun","url":"https://ver.cy/models/thing/cost-overrun/","name":"cost overrun","alternateNames":[],"kind":"thing","status":"published","version":"0.2.0-wave.1","language":"en","classifiers":{"family":"Thing Registry","category":"Society, people and institutions","entryKind":"noun.possession","plane":"SOC","domain":["SOC.ECO"],"industry":[],"navPath":"","tags":[],"facets":{"substance":"social","origin":"conceptual","agency":"inert","mobility":"not-applicable","scale":"not-applicable","affordances":["observable"]}},"whatItIs":"The amount by which the actual cost of a project or purchase exceeds its budget, common in construction, infrastructure, IT and defence projects; causes include optimistic estimates, scope changes, risk events and strategic misrepresentation, and overruns are managed through estimation methods, contingency and change control.","purpose":"Let an agent explain cost overruns by cause, measurement, prevention and accountability, with sourced evidence on project performance.","scope":{"in":[],"out":[],"boundaries":[]},"distinguishingFeatures":["Excess over budget","Measured against a baseline","Common in large projects","Has identifiable causes"],"structure":{"bundles":[{"id":"measure","name":"Measure","description":"Quantifying.","layers":[{"id":"baseline","name":"Baseline","description":"Against what.","findings":[{"id":"baseline-finding","name":"Baseline","description":"Baseline.","questions":[{"text":"What is the overrun compared with the original approved budget?","kind":"measurement"},{"text":"Has the baseline been changed?","kind":"boundary"}]}]},{"id":"inflation","name":"Inflation","description":"Real terms.","findings":[{"id":"inflation-finding","name":"Inflation","description":"Real terms.","questions":[{"text":"Is the overrun stated in real or nominal terms?","kind":"boundary"},{"text":"How does inflation affect it?","kind":"measurement"}]}]}]},{"id":"causes","name":"Causes","description":"Why overruns happen.","layers":[{"id":"analysis","name":"Analysis","description":"Root causes.","findings":[{"id":"analysis-finding","name":"Analysis","description":"Root causes.","questions":[{"text":"What caused this overrun, according to audits or reviews?","kind":"provenance"},{"text":"Was it scope, risk, estimation or misrepresentation?","kind":"definition"}]}]},{"id":"research","name":"Research","description":"Evidence base.","findings":[{"id":"research-finding","name":"Research","description":"Evidence base.","questions":[{"text":"What does research on large projects say about typical overruns?","kind":"provenance"},{"text":"How strong is the evidence?","kind":"boundary"}]}]}]},{"id":"prevent","name":"Prevent","description":"Managing risk.","layers":[{"id":"estimation","name":"Estimation","description":"Better estimates.","findings":[{"id":"estimation-finding","name":"Estimation","description":"Estimation.","questions":[{"text":"How can reference class forecasting or contingency reduce overruns?","kind":"definition"},{"text":"Which guidance applies?","kind":"provenance"}]}]},{"id":"control","name":"Control","description":"Change control.","findings":[{"id":"control-finding","name":"Control","description":"Change control.","questions":[{"text":"How should scope changes be controlled and approved?","kind":"action"},{"text":"Who signs off?","kind":"provenance"}]}]}]},{"id":"accountability","name":"Accountability","description":"Public projects.","layers":[{"id":"audit","name":"Audit","description":"Audit reports.","findings":[{"id":"audit-finding","name":"Audit","description":"Audit reports.","questions":[{"text":"What does the public auditor say about this project overrun?","kind":"provenance"},{"text":"When was it published?","kind":"provenance"}]}]},{"id":"personal","name":"Personal","description":"Home projects.","findings":[{"id":"personal-finding","name":"Personal","description":"Home projects.","questions":[{"text":"How can a household project budget include contingency?","kind":"action"},{"text":"Is the user seeking financial advice?","kind":"boundary"}]}]}]}]},"agentConduct":{"may":["Track budgets against actual costs and report overruns accurately to the project owner.","Explain common causes of overruns and estimation methods."],"mustNot":["Hide or misreport cost overruns.","Produce deliberately optimistic estimates to win approval.","Blame individuals for overruns without evidence."],"requiresHuman":["Approving changes in scope or budget.","Deciding to stop or continue a project in overrun."]},"ethics":{"considerations":["Public project overruns spend taxpayers' money that could serve other needs.","Strategic misrepresentation of costs deceives decision-makers and the public."],"affectedParties":["Taxpayers and funders","Project teams","Communities waiting for the project"]},"owners":{"steward":"The project sponsor or owner who holds the budget.","roles":[],"masterSystems":[]},"relations":[{"target":"oewn-13296870-n","type":"parent","note":"registry parent class"},{"target":"cost","type":"related","note":"category"},{"target":"capital-expenditure","type":"related","note":"project spending"},{"target":"project management","type":"related","note":"discipline"},{"target":"cost-of-capital","type":"related","note":"financing cost"}],"interaction":{"identity":{"applicability":"required","items":["Vercy registry: vr.tr.cost-overrun","Open English WordNet: oewn-13322857-n"]},"properties":{"applicability":"not-applicable","items":[]},"recognition":{"applicability":"optional","items":["Actual cost above budget","Percentage overrun figures","Scope growth changes the baseline","Not physical; figures in budgets, forecasts and audit reports."]},"capabilities":{"applicability":"required","items":["measure an overrun against the baseline","identify causes","apply estimation and contingency methods","find audit reports on public projects"]},"hazards":{"applicability":"required","items":["Moving baselines hiding overruns","Blame without analysis","Optimism bias in estimates"]},"interfaces":{"applicability":"required","items":["Project management standards such as PMBOK and ISO 21502","Public audit rules","Reference class forecasting guidance"]},"context":{"applicability":"required","items":["Project management, public accountability and budgeting.","construction and infrastructure overruns","IT project overruns","defence and public procurement overruns","personal purchase overruns"]}},"sources":[{"title":"Open English WordNet 2024, synset oewn-13322857-n","url":"https://en-word.net/id/oewn-13322857-n","note":"sense and gloss of the concept"},{"title":"Wiktionary: cost overrun","url":"https://en.wiktionary.org/wiki/cost_overrun","note":"word senses and usage"}],"openQuestions":["Should overrun causes be separate entries?","How should audit reports be linked?","How should benchmark data be sourced?"],"resources":{"spec":"/models/things/publications/thing-cost-overrun/spec.json"},"provenance":{"origin":"thing registry research (pass 2)","builtFrom":["models/things/publications/thing-cost-overrun/spec.json"],"providers":["Claude"],"researchStatus":"unreviewed","generatedAt":"2026-09-11T15:11:44Z","builder":"tools/build_cards.py@1.0.0"},"completeness":{"sections":{"classifiers":"filled","whatItIs":"filled","purpose":"filled","distinguishingFeatures":"filled","structure":"filled","agentConduct":"filled","ethics":"filled","owners":"filled","relations":"filled","interaction.identity":"filled","interaction.properties":"not-applicable","interaction.recognition":"filled","interaction.capabilities":"filled","interaction.hazards":"filled","interaction.interfaces":"filled","interaction.context":"filled","sources":"filled"},"notes":{"_gate":"Published through the thing publication gate 1.0 on 2026-10-07T12:16:27+00:00: completeness 1.00; sense: WordNet gloss; 2 live sources; review by codex: pass","interaction.properties":"Plane SOC: no invented physical properties."},"score":1.0}}