Availability and Time Tracking
Work calendars, absence and available capacity; actual time records and their approval. Allocation of capacity across work items is a separate model.
Research draft, second pass
A second pass drafted this model: the structure a model of this thing needs, and what is known about it in the world. The line under this one says how the second half was obtained - researched against sources, or recalled without web access, in which case nothing here was read anywhere and every claim is a lead to verify. Unreviewed either way.
Bundle → Layer → Finding → Questions Missing, in the backlog
Not described yet. This gap is in the card backlog.
Note: Research contour: bundles not designed yet; questions are listed as open questions.
Classifiers Filled
- Family
- Enterprise profiles
- Category
- Enterprise subject
- Entry kind
- subject
- Domain
- EnterprisePEO
- Industry
- Cross-industry
- Tags
- EM-PEO-07W2subjectWorkCalendarAbsenceAvailabilityWorklogTimesheet
What it is Filled
Work calendars, absence and available capacity; actual time records and their approval. Allocation of capacity across work items is a separate model.
Why it exists Filled
Work calendars, absence and available capacity; actual time records and their approval. Allocation of capacity across work items is a separate model.
Distinguishing features Derived, awaiting review
- Hours have a period and a time zone
- The absence of a record does not equal zero
- A medical reason is not included in the regular availability calendar
What robots and AI may and may not do Derived, awaiting review
Must not
- Negative case: A worklog is used as proof of presence or of work quality.
Note: Negative case of the research brief, not yet a rule for agents.
Moral aspects Missing, in the backlog
Not described yet. This gap is in the card backlog.
Owners Filled
Steward
Руководитель HR / ответственный за персонал
Master systems
- HRIS
- кадровый реестр
- ATS
- LMS
Links to other meta-models Filled
references
- WM-ACT-008 - conceptual-candidate
What else AI and robots need to interact with it Incomplete
Identity and identifiers required Derived, awaiting review
- WorkCalendar
- Absence
- Availability
- Worklog
- Timesheet
- TimeApproval
Direct properties not applicable Not applicable
Not applicable
Enterprise record contour: physical properties belong to referenced world models.
Recognition required Missing, in the backlog
Not described yet. This gap is in the card backlog.
Capabilities and actions required Missing, in the backlog
Not described yet. This gap is in the card backlog.
Hazards and failure modes required Missing, in the backlog
Not described yet. This gap is in the card backlog.
Standards and interfaces required Missing, in the backlog
Not described yet. This gap is in the card backlog.
Context of use required Missing, in the backlog
Not described yet. This gap is in the card backlog.
Sources Filled
- HR Open: exchange of HR data
- W3C ORG and ESCO/SFIA: relationships, skills and levels of responsibility
- HRIS/ATS/LMS practice and independent verification of outcome measurement via SPACE
Open questions
- How are planned availability, assigned load and actual time distinguished?
- How are time zones, part-time schedules and overlapping records handled?
- Which absence reasons does an operational consumer need?
- Установить границу и решение reuse/extend/new по действующим спецификациям.
- Подтвердить semantic crosswalk, права и source mastership.
- Выбрать immutable refs; провести проверки fixtures до заявления о публикационной готовности.
Machine files
Provenance
enterprise research programme · published-partial
Built from: enterprise/models/em-peo-07/brief.json
Still in Russian: suggested owner, blocking decisions, vercy candidates. Translate in research/enterprise/i18n/units.en.json.