narrow-gauge railway
Let an agent handle narrow-gauge railways by gauge, line, operator, history, heritage status and visiting.
Research draft, second pass
A second pass drafted this model: the structure a model of this thing needs, and what is known about it in the world. The line under this one says how the second half was obtained - researched against sources, or recalled without web access, in which case nothing here was read anywhere and every claim is a lead to verify. Unreviewed either way.
written by Claude from model knowledge without web access - no source was read, every claim is a lead to verify
Researched by: Claude
Purpose and description
Let an agent handle narrow-gauge railways by gauge, line, operator, history, heritage status and visiting.
A railway with a track gauge narrower than standard gauge (1435 mm), commonly 1000 mm, 1067 mm, 762 mm or 600 mm, used on mountain, industrial, rural and heritage lines.
What it is for: Transport where terrain or cost favours narrower track, and heritage tourism.
It can be identify gauge and line; find timetables for heritage lines; compare gauges by region; volunteer with heritage railways.
Distinguishing features
Narrower than standard gauge
Cheaper to build in difficult terrain
Many now heritage lines
Break of gauge with main lines
What it looks like
Smaller trains on narrow track, often in mountains or on industrial sites.
Physical character
common gauges: 600-1067 mm - selection
How it is recognised
Track gauge under 1435 mm
Tight curves and small rolling stock
Metre gauge is common in many countries
Related models
is a kind of - category
is defined by - measure
is contrasted with - reference
is operated as - use
In practice
Families and kinds
metre gauge
Cape gauge (1067 mm)
762 mm and 750 mm gauges
600 mm field and industrial railways
heritage narrow-gauge lines
Standards and regulation
National railway safety law
Heritage railway regulations
Failure modes and hazards
Level crossing accidents
Outdated timetables
Also called
+17
Where this came from
wikidata · CC0 1.0
Drafted structure
Bundle to layer to finding to question, as the second pass will find it: 4 bundles · 8 layers · 8 findings · 16 questions.
Line Which railway.
Lines differ.
Gauge
Track gauge.
Gauge
Track gauge.
- What is the track gauge? measurement
- Is it common in this region? provenance
Operator
Who runs it.
Operator
Operator.
- Who operates the line? provenance
- Is it public transport or heritage? definition
Travel Riding.
Travellers need facts.
Timetable
Services.
Timetable
Timetable.
- When do trains run, from the official timetable? provenance
- Is it seasonal? provenance
Access
Accessibility.
Access
Accessibility.
- Can wheelchair users travel on the line? provenance
- How should assistance be booked? action
History Heritage.
Lines have histories.
Origin
Construction.
Origin
Origin.
- When and why was the line built? provenance
- What did it carry? provenance
Heritage
Preservation.
Heritage
Preservation.
- Is the line preserved as heritage? provenance
- How can volunteers help? action
Safety Crossings.
Railways are dangerous.
Crossings
Level crossings.
Crossings
Level crossings.
- How should people cross the line safely? action
- Where are crossings? provenance
Trespass
Tracks.
Trespass
Trespass.
- Is walking on the track forbidden here? provenance
- Who should be told of hazards? action
What the second pass must settle
- Should each gauge be a separate entry?
- How should lines be linked?
- How should industrial lines be classified?